Low-Voltage Electric
Applying advance techniques of feeding and handling, flexible conveying, screwing, resistance welding, high-frequency welding, resistance test, on-off test, puncture test and laser marking, Yiheda provides automation solutions of low voltage electrical products production to customers according to the features of products and their demands.
Successful cases: Low voltage switch assembly and testing machine, Circuit breaker assembly and testing machine, fuse full auto production line, release automatic assembly machine,etc.
-
-
-
-
-
-
-
Automatic assembly equipment for temperature fuse fuse
Machine introduction:
The process of temperature fuse fuse assembly is: feed base then detect inner hole, feed fuse, press-fit the base, detect height, feeding ceramic holder and do riveting, feed and detect insulator, assembly, feed spring terminal and do riveting, continuity test and bending, high pressure test and bending, laser marking and other technical stations.